Quality at Every Stage

Build it right the first time. Our milestone QA/QC inspections give asset owners the certainty that every combiner box, tracker, inverter and bolt meets spec before the next construction payment is released.

What is the QA/QC offering?

Cypress Creek Solutions deploys certified technicians and engineers to perform end-to-end site inspections at each contractual milestone—from pile driving and tracker assembly to pre-energization and final commissioning. Using more than 3,000 discrete checkpoints across electrical, mechanical, civil and SCADA scopes, we test, photograph and grade every work package so emerging issues are caught while they are still easy (and inexpensive) to fix. Findings immediately flow into comprehensive deliverables, letting project teams act immediately instead of waiting for a punch-list PDF. The result is smoother energization, higher first-year production and fewer warranty headaches down the road.

Inspections can include:

  • Visual, mechanical and civil checks (racking alignment, torque, grounding)
  • Electrical tests and terminations (IR thermography, insulation, polarity, ratio checks)
  • Inverter, transformer, BESS and substation walk-downs
  • Source-circuit continuity, combiner/BLA verification and MET/SCADA functional tests
  • Formal sign-off packages for key stakeholders

Why Cypress Creek Solutions?

Owner’s Mindset

As an independent power producer and NERC-registered operator, we developed QA/QC playbooks to protect our own fleet; now we apply the same rigor to yours.

 

Data-Driven Transparency

Interactive dashboards surface trends and open punch-list items in real time, empowering EPCs and owners to make fast, confident decisions.

Breadth of Expertise

Certified specialists cover every discipline—modules, racking, AC/DC cabling, inverters, BESS, substation, MET towers and civil work—so nothing slips through the cracks.

Engineers huddled for a meeting at a solar site before an inspection

Risk and Cost Control

Catching defects at the milestone stage minimizes rework, prevents schedule overruns, and locks in long-term reliability and production.

Flexible Scope

We can share our experience with curious customers to dial in on the most cost-effective inspection scope for the application. No job is too big or too small.

Owner’s Mindset

Owner’s Mindset

As an independent power producer and NERC-registered operator, we developed QA/QC playbooks to protect our own fleet; now we apply the same rigor to yours.

 

Data-Driven Transparency

Data-Driven Transparency

Interactive dashboards surface trends and open punch-list items in real time, empowering EPCs and owners to make fast, confident decisions.

Breadth of Expertise

Breadth of Expertise

Certified specialists cover every discipline—modules, racking, AC/DC cabling, inverters, BESS, substation, MET towers and civil work—so nothing slips through the cracks.

Engineers huddled for a meeting at a solar site before an inspection

Risk and Cost Control

Risk and Cost Control

Catching defects at the milestone stage minimizes rework, prevents schedule overruns, and locks in long-term reliability and production.

Flexible Scope

Flexible Scope

We can share our experience with curious customers to dial in on the most cost-effective inspection scope for the application. No job is too big or too small.

Your Questions Answered

Which milestones can you cover?

We tailor checkpoints to any contractual schedule—mechanical completion, pre-energization, substantial completion, final commissioning and warranty turnover.

How quickly do we get the results?

Preliminary findings appear in the dashboard as soon as the inspection team syncs on-site data—usually the same day—with a formal report issued within 48 hours.

Do you inspect storage systems as well as PV?

Yes. Our scope includes PCS, battery racks, and fire-suppression systems.

What if you find critical non-conformances?

We flag them in red, attach photos and recommended remedies, and can return to verify corrective actions once completed.

Will using a third-party QA/QC slow construction?

No—our teams integrate with EPC schedules, and real-time reporting helps crews fix issues before the next trade mobilizes, often accelerating overall progress.